Target costs, effect of product-design changes on product costs. Neuro Instruments uses a…

Target costs, effect of product-design changes on product costs. Neuro Instruments uses a manufacturing costing system with one direct-cost category (direct materials) and three indirect-cost categories:

a. Setup, production-order, and materials-handling costs that vary with the number of batches

b. Manufacturing-operations costs that vary with machine-hours

c. Costs of engineering changes that vary with the number of engineering changes made

In response to competitive pressures at the end of 2016, Neuro Instruments used value-engineering techniques to reduce manufacturing costs. Actual information for 2016 and 2017 is as follows:

The management of Neuro Instruments wants to evaluate whether value engineering has succeeded in reducing the target manufacturing cost per unit of one of its products, HJ6, by 5%.
Actual results for 2016 and 2017 for HJ6 are:

Required

1. Calculate the manufacturing cost per unit of HJ6 in 2016.

2. Calculate the manufacturing cost per unit of HJ6 in 2017.

3. Did Neuro Instruments achieve the target manufacturing cost per unit for HJ6 in 2017? Explain.

4. Explain how Neuro Instruments reduced the manufacturing cost per unit of HJ6 in 2017.

5. What challenges might managers at Neuro Instruments encounter in achieving the target cost? How might they overcome these challenges?

Place your order
(550 words)

Approximate price: $22

Calculate the price of your order

550 words
We'll send you the first draft for approval by September 11, 2018 at 10:52 AM
Total price:
$26
The price is based on these factors:
Academic level
Number of pages
Urgency
Basic features
  • Free title page and bibliography
  • Unlimited revisions
  • Plagiarism-free guarantee
  • Money-back guarantee
  • 24/7 support
On-demand options
  • Writer’s samples
  • Part-by-part delivery
  • Overnight delivery
  • Copies of used sources
  • Expert Proofreading
Paper format
  • 275 words per page
  • 12 pt Arial/Times New Roman
  • Double line spacing
  • Any citation style (APA, MLA, Chicago/Turabian, Harvard)

Our guarantees

Delivering a high-quality product at a reasonable price is not enough anymore.
That’s why we have developed 5 beneficial guarantees that will make your experience with our service enjoyable, easy, and safe.

Money-back guarantee

You have to be 100% sure of the quality of your product to give a money-back guarantee. This describes us perfectly. Make sure that this guarantee is totally transparent.

Read more

Zero-plagiarism guarantee

Each paper is composed from scratch, according to your instructions. It is then checked by our plagiarism-detection software. There is no gap where plagiarism could squeeze in.

Read more

Free-revision policy

Thanks to our free revisions, there is no way for you to be unsatisfied. We will work on your paper until you are completely happy with the result.

Read more

Privacy policy

Your email is safe, as we store it according to international data protection rules. Your bank details are secure, as we use only reliable payment systems.

Read more

Fair-cooperation guarantee

By sending us your money, you buy the service we provide. Check out our terms and conditions if you prefer business talks to be laid out in official language.

Read more
error: Content is protected !!